6-6 Traffic
Where is the proposed laydown area? Has this location and its potential impact been included in the traffic studies?
RESPONSE 6-6:
| A laydown area is proposed within the Clear River site. The traffic study will include an evaluation of sight distance at the site driveway. There is potential to use an off-site laydown area during construction. A number of sites have been investigated. At this point, the off-site laydown area is likely to be at either the Port of Providence (35 Terminal Road, Providence, RI) or Quonset Development Corporation (QDC 95 Cripe Street, North Kingstown, RI).
|
RESPONDENT:
| Maureen Chlebek, McMahon Associates
|
DATE: | May 11, 2016
|