Construction: 4-2

How much existing material is reusable on site, how much material must be trucked off site, and how much material will need to be brought onto the site?

Based on the results of the geotechnical report, all excess material anticipated will be utilized on site as fill.  Additional materials, such as crushed stone and gravel, are anticipated to be brought onto the site. The approximate amount of new material to be brought on the site is anticipated to be about 5,000 cubic yards.