Waste Water: 4-22

It appears that the discharge of the used water to the waste water treatment facility will remove the water from the aquifer cycle and then after treatment by the sewer plant send it down stream on the other side of town. Is this correct?

The wastewater discharged from the CREC facility will be conveyed to the existing Town of Burrillville sanitary sewer system and through that system to the Town of Burrillville Wastewater Treatment Facility, located at 141 Clear River Drive.  The wastewater will then be discharged to the Clear River in the vicinity of the BWWTF. This is the same transport route used for anyone who receives water from the Pascoag Utility District (“PUD”) and sends wastewater to the BWWTF.