6-6 Traffic

Where is the proposed laydown area? Has this location and its potential impact been included in the traffic studies?

RESPONSE 6-6:

 

A laydown area is proposed within the Clear River site.  The traffic study will include an evaluation of sight distance at the site driveway.  There is potential to use an off-site laydown area during construction.  A number of sites have been investigated.  At this point, the off-site laydown area is likely to be at either the Port of Providence (35 Terminal Road, Providence, RI) or Quonset Development Corporation (QDC 95 Cripe Street, North Kingstown, RI).

 

RESPONDENT:

 

Maureen Chlebek, McMahon Associates

 

DATE:

May 11, 2016