1-16 Security
Please identify in detail the company’s security plans during and after construction.
RESPONSE:
| The Project will have a security gate and will have 24/7 security during both construction and operations. During construction, the property will be fenced in with 24-hour security at a guard shack located at the entrance.
Post construction, a permeant security fence that will be eight feet tall, topped with barbed wire, card readers will be installed at critical points along with CCTV, with monitoring from the control room.
|
RESPONDENT:
| John Niland, Director, Business Development, Invenergy |
DATE: | March 31, 2016 |