Construction: 4-6

The plans that were incorporated into the package consist of five sheets with no details. Please provide fully detailed plans.

Site grading and stormwater detailed plans are in the process of being developed and will be provided as soon as they are completed which should be in four weeks. Other detailed plans associated with buildings, underground utilities and piping systems are prepared by the EPC construction contractor after detailed engineering has been completed.  The EPC contractor has not yet been selected for this project.  For power generation projects, additional detailed drawings are normally provided at the time the project applies for the local building permit.  Detailed plans will be provided at that time.