According to DEM…

proper inventory should be done
lakeside

"[A] complete biological inventory would need to be done in all on-site habitats over several seasons, and ideally over several years, to provide a reasonable picture of what species utilize which portions of the site and for what portion of the lifecycle.

The Town of Burrillville recognizes that a pull-quote does not tell the whole story. In our point-of-view, this excerpt is indicative. While DEM was unable to draw definitive conclusions, the Town of Burrillville concludes that this power plant is not needed and is harmful to Burrillville, Rhode Island and surrounding areas. Follow these links to read the DEM advisories and drawn your own conclusions: [9-12-16 DEM Advisory Opinion] and [8-15-17 DEM Supplemental Advisory]


Town of Burrillville
105 Harrisville Main St.
Harrisville, RI  02830
401-568-4300

lphaneuf@burrillville.org