Rubble Waterline installation Waterline installation Inside single level wing before cleanup Outside single level wing before cleanup Future private residential patios Hollow Building Geothermal well drilling South parking lot prep Roof topping excavation (layers of material totaling 8" removed) Realignment of subsurface stormwater Realignment of subsurface stormwater Future public plaza (private patios beyond brick demising wall) Public plaza extended from library Future private residential patios