Concrete pumped to roof Second floor concrete pour Electrical conduit installation Concrete pumped to roof Final grade preparation north of single level wing Concrete pumped to roof Original single level wing roof Rough window frames complete North brink end required new roof Sewer line connection Sewer line connection New concrete window sill South parking lot prep Six geothermal wells, 1,500' deep, will offste heating and cooling costs Formed window sill